Artist’s impression: a finished SHAVAS panel, carried at sunrise
Roadmap
From research to series production.
The next step is not a distant promise: it is a measurement, entrusted to independent laboratories under protocols set in advance. Its first results are expected in early 2027.
What we have done, what is in progress, what comes next
Done
In progress
Upcoming
What we have done · 2018–20262018
Research begins on three-dimensional photovoltaics
2021
First prototype (summer)
First outdoor comparative measurements by a photovoltaic testing laboratory (October)
Founding patent application filed on December 30, 2021
2022
Several reduced-scale prototypes, tested in-house, confirm the principle of the founding patent
Preliminary study by a major public research organization (October)
International application for the founding patent (December)
2023
Simulations across five sites by the same organization (January)
Three additional patent applications filed: module backsheet, circuit and manufacturing process
Full-size demonstrators (June and August)
Interview on the Tech & Co program on BFM Business (October)
Optical ray-tracing study
Founding patent granted in France (November 24) and first independent valuation of the portfolio
2024
Portfolio audit by an international audit firm (February)
International extension of the founding patent
Encapsulated prototype, measured under real-world conditions by an independent laboratory (July)
Preliminary assembly line study (July)
TF1 news report (September), Green News Techno article (November)
Exploration of perovskite integration (December)
2025
Preliminary module specifications and preliminary industrial design with an engineering firm
Project received twice by the office of a French minister and by government departments; a ministerial letter identifies the public programs to which applications should be directed
Founding patent granted in South Africa
2026
SHAVAS Technologies founded (January 23)
European grant with unitary effect (May 13) and US grant (June 2)
Patents contributed to the company (August 1), with the contribution value deemed not overstated by the contribution auditor
Portfolio value confirmed by an independent valuation
Project presented to the authorities of two other European countries
43 shareholders united around the project
In progressDec. 2026–Q1 2027
Measurement consolidation prototype, measured at the maximum power point against a flat reference made of the same material, by independent laboratories and under a protocol agreed with them in advance
Applications for public funding, prepared with a specialized firm, including the “Sustainable Energy” research call for projects from ADEME (the French Agency for Ecological Transition), announced for December 2026
As soon as results are in, first licenses, converted from pre-licenses or sold directly: panel manufacturers, major installers, solar plant developers
Work begins on the pilot line, led by a specialist engineer who is a shareholder in the company
Outdoor measurement campaign over several months, then choice of manufacturing process: silicon or perovskite
Process patent applications filed
2028
Conventional-format panel
Qualification to the IEC 61215 and 61730 standards
Pilot line commissioned
2029
First series production from the pilot line
Rollout of licenses to manufacturers
Provisional schedule, subject to change.
The next milestone
The measurement consolidation prototype
The measurement consolidation prototype will be measured at the maximum power point against a flat reference made of the same material, under a protocol approved beforehand with the laboratories. It will determine the gain of the reference shape more precisely.
Why it sets the reference value
01
1.4 to 1.8 times the energy of a flat module, on the same ground footprint: a gain established by two third-party organizations, one through simulation, the other through measurement. The measurement consolidation prototype will determine its value more precisely.
02
A pre-license reserves, starting now, the right to manufacture or sell panels with SHAVAS geometry; it becomes a license once the consolidation measurements confirm the gain.
03
The assembly selected for series production will be finalized in 2027, together with the choice of manufacturing process, in light of the consolidation measurements.
The energy gain at the maximum power point, by independent laboratories and under protocols set in advance.
The thermal behavior of the three-dimensional relief, by thermography, to confirm our in-house tests.
The response to the sun’s angle and the lengthening of the production day.
How well the gain holds up over several months outdoors.
The final assembly of the facets, balancing performance against ease of industrialization, within the scope of the patent.
What this changes for SHAVAS
In our plan, the first license sold covers all of the company’s operating costs until the pilot line is commissioned and the first series production begins. It secures cash flow without depending on the timing of public funding, which supplements the financing. From that point on, the company no longer depends on raising capital to operate.
Contact
Get in touch
Investors, industrial companies and laboratories can write to us directly. Technical and financial documentation is shared after signing a non-disclosure agreement (NDA).