Non-binding visualization of the SHAVAS panel

Independent studies and measurements

Studied and measured by third parties, on the road to qualification.

What independent organizations have studied and measured, and the path to qualifying the panel. No product certification has been obtained to date.

Studies and measurements carried out

Studies and measurements, not yet certifications

The 2024 encapsulated prototype on its outdoor test bench
July 2024The encapsulated prototype on its outdoor test bench, next to a flat reference.
YearOrganizationTypeSubject
2021Photovoltaic testing laboratoryOutdoor comparative measurementsA prototype compared with a flat reference: power ratio of 1.4 to 1.8 depending on irradiance
2022–2023A major public research organizationRadiative and electrical simulationsEnergy gain on the same footprint, across five sites and four seasons, including shading between facets
2023Optical engineering firmRay tracingPath of light through the three-dimensional relief
2024An independent laboratoryReal-world measurements over six daysOutdoor behavior of an encapsulated prototype
2024Prototype analysisElectroluminescenceCondition of the encapsulated prototype’s cells

Artist’s impression

Intellectual property

A portfolio valued and audited by independent third parties

Independent valuation

Portfolio value established in 2023 by an patent attorney firm, then confirmed in 2026.

Audit

Portfolio audited in 2024: all IP rights are in force and the founding patent is novel and inventive.

Contribution auditor

In 2026, the value at which the patents were contributed to the company was deemed not to be overstated.

No opposition

No opposition has been filed to date against the patents in the portfolio.

See the patents

The roadmap

What we have done, what is in progress, what comes next

  • Done
  • In progress
  • Upcoming
  1. What we have done · 2018–20262018
    • Research begins on three-dimensional photovoltaics
  2. 2021
    • First prototype (summer)
    • First outdoor comparative measurements by a photovoltaic testing laboratory (October)
    • Founding patent application filed on December 30, 2021
  3. 2022
    • Several reduced-scale prototypes, tested in-house, confirm the principle of the founding patent
    • Preliminary study by a major public research organization (October)
    • International application for the founding patent (December)
  4. 2023
    • Simulations across five sites by the same organization (January)
    • Three additional patent applications filed: module backsheet, circuit and manufacturing process
    • Full-size demonstrators (June and August)
    • Interview on the Tech & Co program on BFM Business (October)
    • Optical ray-tracing study
    • Founding patent granted in France (November 24) and first independent valuation of the portfolio
  5. 2024
    • Portfolio audit by an international audit firm (February)
    • International extension of the founding patent
    • Encapsulated prototype, measured under real-world conditions by an independent laboratory (July)
    • Preliminary assembly line study (July)
    • TF1 news report (September), Green News Techno article (November)
    • Exploration of perovskite integration (December)
  6. 2025
    • Preliminary module specifications and preliminary industrial design with an engineering firm
    • Project received twice by the office of a French minister and by government departments; a ministerial letter identifies the public programs to which applications should be directed
    • Founding patent granted in South Africa
  7. 2026
    • SHAVAS Technologies founded (January 23)
    • European grant with unitary effect (May 13) and US grant (June 2)
    • Patents contributed to the company (August 1), with the contribution value deemed not overstated by the contribution auditor
    • Portfolio value confirmed by an independent valuation
    • Project presented to the authorities of two other European countries
    • 43 shareholders united around the project
  8. In progressDec. 2026–Q1 2027
    • Measurement consolidation prototype, measured at the maximum power point against a flat reference made of the same material, by independent laboratories and under a protocol agreed with them in advance
    • Applications for public funding, prepared with a specialized firm, including the “Sustainable Energy” research call for projects from ADEME (the French Agency for Ecological Transition), announced for December 2026
    Talk to the founder
  9. What comes next · 2027–20292027
    • As soon as results are in, first licenses, converted from pre-licenses or sold directly: panel manufacturers, major installers, solar plant developers
    • Work begins on the pilot line, led by a specialist engineer who is a shareholder in the company
    • Outdoor measurement campaign over several months, then choice of manufacturing process: silicon or perovskite
    • Process patent applications filed
  10. 2028
    • Conventional-format panel
    • Qualification to the IEC 61215 and 61730 standards
    • Pilot line commissioned
  11. 2029
    • First series production from the pilot line
    • Rollout of licenses to manufacturers

Provisional schedule, subject to change.

See the full roadmap
Next steps

The path to qualification

  1. 2027

    Consolidation measurements at the maximum power point by independent laboratories, then an outdoor measurement campaign over several months.

  2. 2027–2028

    Durability testing: damp heat, thermal cycling, ultraviolet exposure.

  3. 2028

    Qualification of a conventional-format panel to the IEC 61215 (design) and IEC 61730 (safety) standards, with a test plan agreed with a certification body.

No product certification has been obtained to date. This page will be updated at each stage.

Follow our progress

Results of the consolidation measurements

The first results are expected in early 2027. Write to us to be kept informed.